Slide the launcher tiles into correct sequence to rebuild the ISRO rocket launch pad scene.
Rocket stages are integrated vertically inside the VIB at Sriharikota before being rolled out on the Mobile Launch Pedestal (MLP).
Satellites like Chandrayaan and Aditya-L1 are encapsulated within heat shields to protect them during atmospheric ascent.
Cryogenic and hypergolic propellants are loaded into stage tanks prior to automatic launch sequence initiation.
Click or tap any tile adjacent to the blank space. The tile will smoothly slide into the blank position.
First align the top row (tiles 1, 2, 3), then align the left column, and finally solve the remaining 2x2 corner grid.